PREPARING FOR SUMMER’S SHUTDOWN WORK



By
rmmsadmin
13 July 18
0
comment

Raymond Masterson Mechanical Services Ltd are carrying out Pre-Fabrication and GTAW Orbital Welding for various tie-ins on critical systems on numerous projects over the Upcoming Summer Shutdowns in our Clients Pharmaceutical Manufacturing Facilities.

These tie-ins include Clean Steam, WFI Loops, DW Water and alterations to High Purity Pipework on Process Machines.

All spool pieces are fabricated in our workshops, visual inspected and 100% Borescoped & recorded, Pressure Tested, Degreased and Passivated with a complete documentation package attached.

Prefabrication of the spools allows us to reduce our time on site meaning our clients have less production downtime.

 

  

 

 

Leave a Reply

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>