
Raymond Masterson Mechanical Services Ltd are carrying out Pre-Fabrication and GTAW Orbital Welding for various tie-ins on critical systems on numerous projects over the Upcoming Summer Shutdowns in our Clients Pharmaceutical Manufacturing Facilities.
These tie-ins include Clean Steam, WFI Loops, DW Water and alterations to High Purity Pipework on Process Machines.
All spool pieces are fabricated in our workshops, visual inspected and 100% Borescoped & recorded, Pressure Tested, Degreased and Passivated with a complete documentation package attached.
Prefabrication of the spools allows us to reduce our time on site meaning our clients have less production downtime.
Leave a Reply